When the machine is working, the machine starts to work properly when the preparation (dust removal system, separator, lifter, vertical spiral conveyor, transverse spiral conveyor, roller, projectile, etc.) is complete. First of all, in the outside of the room will be placed on the roller road, through the roller channel transport into the blast cleaning room, at this time open the pill gate, began to the workpiece to clean up the projectile, clean up, close the supply of the pill gate, the workpiece through the roller channel to transport out of the room outside.
正在翻译中..