3.2.1.2 Test Setup Two—OutdoorUse the following instructions to set up the simulated solar panel model test hardware.1. Connect the SCL, SDA, and GND lines from the charger board on either connector J7 or J8 to thefollowing pins on the LaunchPad development kit.• SCL - P5.3• SDA - P5.2• GND - Any GND on the Launchpad2. Connect a Li-ion cell to terminal J4.3. Move the jumper on header JP2 between D- and D-/PG.4. Remove the jumper on header JP1.5. Add jumper to header Jp5 between D- and D+/PSEL.6. Connect solar panel output terminals to the VBUS and GND of terminal J1.7. Run the code on the LaunchPad development kit.