After the water load combined with preloading, <br><br>vacuum preloading and pressure stabilization, the cofferdam is covered with water around the preloading zone. The cofferdam adopts clay cofferdam with a height of 2.5 m, and the inside of the cofferdam is impervious with a special impermeable membrane. <br>Make sure that the vacuum pre-pressure is stabilized above 80 kPa for a period of time before water coating. The water-covering height is controlled at an average of 2.0 m, and after reaching the water-covering height, it should be no less than 70 days.