The project will require an investment of more than 1 billion euros and could become operational by2026. The site, based on electrolysis technology, will only use water and air as raw materials. It willbe supplied with renewable energy from wind and hydropower sources. This initiative, known as“Green Wolverine”, builds on Grupo Fertiberia’s decarbonisation efforts in Spain, as well as on theexceptional conditions offered by the Norrbotten region, where 100% of electricity production alreadycomes from renewable sources.