When immersed in LHLP environment for half a month, the rising height of the solution on the surface of the specimen is the same as that of immersion for 24 h, and no obvious crystal precipitation is seen. After half immersion for 3 months, it was found that the mortar specimen exposed to the air had expansion cracks on the side adjacent to the molding surface, and the cracks extended to the opposite direction of the molding surface. The water-to-binder ratio of the forming surface is the largest, but it remains intact under the action of high-concentration salt erosion.
正在翻译中..