Within one month after the equipment arrives at the Vietnamese port or within 10 days of reaching the factory, the seller’s technicians can start to install the equipment and guide the buyer’s workers to make and install the relevant steel structure. According to this plan, the buyer needs to provide the seller with the documents required for the visa in advance, so that the visa can be obtained smoothly.