On vertical vessels and equipment, the metal cladding shall be supported on HDG steel S-clips spaced on 1.2-meter centres. The metal cladding shall be secured with bands spaced on 300 mm centres with 1 band at each circumferential lap. Band loops shall be installed on each band to prevent vertical movement. Loop shall be placed on 4-meter centres with no fewer than 2 loops per band.