3.1.1 Equipment and materials 3.1.1.1 Materials Plate: ASTM A240 Type 321 Piping: ASTM A312 Type 321 Fittings: ASTM A403 GR. WP321 Internal Flanges: ASTM A182 GR. F321 Bolts: ASTM A193-B8T Nuts: ASTM A194 GR. 8MA (SS316) 3.1.1.2 The following equipment and materials are included: 128-R-101 128-R-102 Description/Components 1 1 Top Rough Liquid Distribution Tray: Includes support beams and associated bolts, nuts, and washers 1 1 Top Vapor/Liquid Distribution Tray: Includes support beams, hangers/fasteners, ceramic fiber blanket gaskets, ceramic fiber rope packing, associated bolts, nuts, and washers 5 5 Lower Rough Liquid Distribution Tray: Includes support beams and associated bolts, nuts, and washers 5 5 Lower Vapor/Liquid Distribution Tray: Includes support beams, hangers/fasteners, ceramic fiber blanket gaskets, ceramic fiber rope packing, associated bolts, nuts, and washers Included Included Construction and installation accessories: Includes all bolts, nuts, washers (10% spares), J-clips and wedge pins (10% spares), rope packing, seal blanket, and gaskets (20% spares), and/or miscellaneous parts required for installation of the UOP supplied equipment 3.1.2 Documentation Delivery Schedule Data Book Content Item Number DESCRIPTION General M 1 Monthly progress reports 2S 2 Packing list Drawings 0S X 3 Installation drawings Procedures and Qualifications 12F 4 NDE procedures (visual/MT/PT) 12F 5 PMI procedure 12F 6 Packing procedure Certifications/Test Data/Inspection Reports 0S X 7 Material Test Records (MTR) 0S X 8 NDE reports (visual/MT/PT)