At this stage, the contract requires the maintenance equipment and machine tools are not tendered, the design plan is based on the contract requirements, reference to the same capacity unit engineering design arrangement, and reference to the "thermal power plant test, repair equipment and building area configuration standards" on the general maintenance of the power plant equipment and the required area.
正在翻译中..