Put the Panel GB into the right shuttle tray and move to robot-1 grab position A (cam jack up). Refer to steps 5~8 to complete the robot-1 and right Shuttle position verification
Place the Panel GB on the right shuttle disk and move to robot-1 grab bit A (CAM top). Refer to steps 5 to 8 to complete the robot-1 and right Shutter position verification