要实现工程项目建设进度的有效管理,就必须在项目建设初期系统化的编制进度管理计划。就目前而言,建设企业对于进度计划的管理主要存在两个方面的问题的英语翻译

要实现工程项目建设进度的有效管理,就必须在项目建设初期系统化的编制进度

要实现工程项目建设进度的有效管理,就必须在项目建设初期系统化的编制进度管理计划。就目前而言,建设企业对于进度计划的管理主要存在两个方面的问题:一方面,在进度计划编制过程中,其未能充分考虑工程建设环境、技术指标、施工能力、材料设备配给程度等因素,这使得进度管理计划的可操作性不强,不能对工程项目建设形成有效指导;另一方面,在实际建设中,部分施工单位不能严格按照施工计划进行施工,这使得实际进度脱离预期计划,对工程项目建设造成阻碍。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
To achieve effective management of the construction schedule of a project, it is necessary to systematically prepare a schedule management plan in the initial stage of project construction. At present, there are two main problems in the management of schedule plans by construction companies: On the one hand, in the process of preparing schedule plans, they failed to fully consider the construction environment, technical indicators, construction capabilities, and the degree of material and equipment allocation. Factors, which make the schedule management plan not very operability and can not form effective guidance for the construction of the project; on the other hand, in actual construction, some construction units cannot strictly follow the construction plan, which makes the actual schedule deviate from the expected plan , Which hinders the construction of engineering projects.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
In order to realize the effective management of the construction progress of the project, it is necessary to systematically prepare the progress management plan in the early stage of the project construction. At present, there are two main problems in the management of the progress plan of the construction enterprise: on the one hand, in the process of planning the progress, it fails to fully consider the engineering construction environment, technical indicators, construction capacity, material and equipment ration and other factors, which makes the progress management plan less operability, can not form effective guidance for the construction of the project; It hinders the construction of the project.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In order to realize the effective management of project construction progress, it is necessary to systematically prepare schedule management plan in the initial stage of project construction. At present, there are two problems in the schedule management of construction enterprises: on the one hand, in the process of schedule preparation, it fails to fully consider the factors such as engineering construction environment, technical indicators, construction capacity, material and equipment rationing degree, which makes the schedule management plan not operable and can not form effective guidance for the construction of engineering projects; On the other hand, in the actual construction, some construction units can not carry out the construction in strict accordance with the construction plan, which makes the actual progress deviate from the expected plan and hinders the construction of the project.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: