Complete the confirmation of solid air conditioning system equipment and carry out the work; Responsible party: Public Works (before Thursday)<br>Complete the confirmation of solid and QC pharmaceutical water system equipment; Responsible party: Public engineering (before Wednesday)<br>Complete the revision of the operating procedures for the air conditioning system in workshop 1 of solid preparations; Responsible party: Public engineering (before Wednesday)<br>Complete the integrity inspection and rectification of solid, QC, and warehouse on-site data; Responsible party: Public Works (before Thursday)
正在翻译中..