307 workshop subcontracting room on the third floor electronic scales transferred to the fourth floor of the granulation chamber 2 changes: the <br>program will TSC-60 electronic scales to move out of the room on the third floor room subcontracting 2319, 2407 transferred to the fourth floor room granulation chamber 2, by the meter after the staff of electronic scales annual calibration for the granulation process orlistat pellets weighing his product wet granules, pellets and products to be orlistat cleaning validation to confirm compliance and then moved back to 2319 sub-chamber room, and measurement calibration by qualified personnel before put into use. "
正在翻译中..