按照工期要求,各级均应按上一级的施工计划结合各自实际按月制定详细的实施方法和方案,在制定施工计划时,要留有余地,充分考虑节假日和气候对施工的的英语翻译

按照工期要求,各级均应按上一级的施工计划结合各自实际按月制定详细的实施

按照工期要求,各级均应按上一级的施工计划结合各自实际按月制定详细的实施方法和方案,在制定施工计划时,要留有余地,充分考虑节假日和气候对施工的影响。重要的工序要做好详细的实施性施工组织设计和施工计划,并报监理工程师审批,充分利用有利条件和时间,合理安排各分项工程的施工顺序,缩短流水作业步距,加快工程进度,以确保工期。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
In accordance with the schedule requirements, according to the construction plan on all levels should be level with their actual monthly develop a detailed implementation methods and programs in the development of construction plans, to leave room for the holidays and give full consideration to the impact of climate on construction. Important process to do the detailed implementation of the construction organization design and construction plans, and report to the supervising engineer for approval, make full use of favorable conditions and time, reasonable arrangements for the construction sequence of the sub-projects, shorten assembly-line step distance, speed up the progress of the project, to ensure that the construction period.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
In accordance with the schedule requirements, all levels should be in accordance with the construction plan at the previous level in conjunction with their actual monthly detailed implementation methods and programs, in the formulation of construction plans, to leave room, fully consider the holidays and climate on the impact of construction. Important processes should do a good job in detail the implementation of the construction organization design and construction plan, and report to the supervising engineer for approval, make full use of favorable conditions and time, reasonable arrangement of the construction order of each sub-project, shorten the flow of water operation steps, speed up the project progress to ensure the duration.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
According to the requirements of construction period, all levels shall formulate detailed implementation methods and schemes according to the construction plan of the next higher level combined with their own actual conditions on a monthly basis. When making the construction plan, there shall be room to take full account of the impact of holidays and climate on the construction. For important processes, detailed implementation construction organization design and construction plan shall be made and submitted to the supervising engineer for approval. Favorable conditions and time shall be fully utilized, construction sequence of each sub project shall be reasonably arranged, flow operation step distance shall be shortened, and project progress shall be accelerated to ensure construction period.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.