Based on the shield construction in the tunnel section between dongyihuan Road station and Tongling Road Station of the fourth civil engineering bid of Hefei Metro Line 2, this paper discusses the experience of shield starting, and analyzes several aspects that should be emphasized in the control of shield starting construction.<br>
正在翻译中..