DEMOLITION AND ALTERATION WORKSEXISTING STRUCTURAL ALTERATION WORKSDemolish existing hanger wall at grid 9-11/E1-A; with the associated finishes; including removal and disposal of debris and making good of disrturbed area; all as detailed on Drawings and Specification (Approximate are = 92m2)EXISTING FINISHES WORKSDemolish existing floor finishes; including removal and disposal of debris and making good works disturbed; all as detailed on Drawings and SpecificationArrival ConcourseDemolish existing raised floor finishes, supporting frame and all necessary accessories; including removal and disposal of debris and making good works disturbed; all as detailed on Drawings and SpecificationExisting CuCExisting Tourist Services CentreDemolish existing skirting finishes; including removal and disposal of debris and making good works disturbed; all as detailed on Drawings and SpecificationArrival Concourse