Additional documentsThe Bidder shall submit with its Technical Bid the following additional documents and all requirements:10MW Altai solar PVConstruction technical drawings and drawings of the project, including but not limited to:• General layout detailing main equipment, temporary use area during the construction period, accessroad, security fence, buildings, technical works, tracks, cable trenches• PVsyst production model / report• Building Layout drawings & Building characteristics• Certificates of suppliers regarding warranties for main equipment• Single Line Diagram (System to interconnection point)• Control system architecture showing all components of the project• Architecture of the alarm system and fire protection• Schematic diagram of the telecommunication system, including the interfaces;• Diagram of the energy metering system, including the interfaces• Health and safety management plan draft for the construction phaseOperational Documentation:• Principles of the system / cleaning procedure of PV modules• Health and safety management plan draft for the operational phase• Scope of servicesRecommended spare parts list