⑧ During the curing period, frequent watering should be carried out to keep the concrete surface moist at all times. Before and after the end of the curing period, the concrete surface should be promptly inspected for any shrinkage cracks. If shrinkage cracks are found, the watering and curing time should be appropriately increased. The formwork can only be removed after the concrete reaches the specified strength according to regulations. In addition, according to summer construction requirements, only when the temperature of the concrete core reaches the highest value and it is confirmed that it is in the declining stage, can the formwork be removed.
正在翻译中..