ARTICLE 33: CHANGES1 Change Order 1.1 At any time, Contractor may direct, in a Change Order, Subcontractor to make a change within the general scope of the Contract ("Change") such as, but not limited to, alterations of the Work or changes in the sequence of the performance of the Work and Subcontractor shall perform the Work as specified in the Change Order.1.2 In addition to describing the Change, a Change Order shall include the following:a) Any adjustment in the Final Acceptance Date resulting from the Change andb) The price of or the basis for determining any increase in the compensation due Subcontractor or credit due Contractor as a result of the Change, if any