① material change, with the adjustment of material and soften. <br>② reduced and an insulator core lay length. <br>③ increase the outer diameter. (Standard range)
① Material change, coordination adjustment and material softening.<br>② Reduce the stranding distance between core wire and insulator.<br>③ Increase the outside diameter. (within the scope of the standard)