1. 立即在品保系统内增加可焊性的检验项次,将CP线可焊性检测项目增加到品保检验系统第6项可焊性测试。(见附件1 品保系统检验项次新增截图)的英语翻译

1. 立即在品保系统内增加可焊性的检验项次,将CP线可焊性检测项目增加

1. 立即在品保系统内增加可焊性的检验项次,将CP线可焊性检测项目增加到品保检验系统第6项可焊性测试。(见附件1 品保系统检验项次新增截图)2. 对新进/在职品检员进行培训,检验过程中如发现系统内检验项目跟《原材料控制计划》不一致时需及时报告IQC课长/主管并进行修改。(见附件2 品检员培训记录 )3. 已于2020年4月8日开始将CP线按《原材料管制计划》进行检验并纳入系统管理。(见附件3 CP线进料检验报告)4. 检查品保系统其他原材料检验项目有无类似情况造成系统缺失。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. Immediately increase the solderability inspection items in the quality assurance system, and increase the CP line solderability inspection items to the sixth solderability test in the quality assurance inspection system. (See appendix 1 for new screenshots of the inspection items of the quality assurance system) <br>2. Train new / in-service quality inspectors. If any inspection items in the system are found to be inconsistent with the "Raw Material Control Plan" during the inspection process, the IQC Section Chief shall be reported in time / Supervisor and make changes. (See Attachment 2 Training Record of Quality Inspector) <br>3. On April 8, 2020, the CP line was inspected according to the "Raw Material Control Plan" and included in the system management. (See Attachment 3 CP Line Incoming Inspection Report) <br>4. Check the quality assurance system for other raw material inspection items for similar conditions causing the system to be missing.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. Immediately add the weldability test in the quality assurance system, and add the CP wire weldability test item to the 6th solderability test of the quality assurance system. (See Annex 1 New screenshot of product insurance system inspection items)<br>2. Training of new/on-the-job product inspectors, and timely report ingress/supervisor sqispere and make changes in the course of inspection if they find that the inspection items in the system are inconsistent with the Raw Material control plan. (See Annex 2 Product Inspector Training Record)<br>3. The CP line has been tested and integrated into the system since 8 April 2020 under the Raw Materials Control Plan. (See Annex 3 CP line feed inspection report)<br>4. Check the quality assurance system for other raw material inspection items for similar conditions resulting in the system is missing.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Immediately add the weldability inspection items in the quality assurance system, and add the weldability inspection items of CP line to Item 6 of the quality assurance inspection system. (see Annex 1 screenshot of new inspection item of quality assurance system)<br>2. Train the new / on-the-job quality inspectors. In case of any inconsistency between the inspection items in the system and the raw material control plan in the inspection process, report to the IQC section chief / Supervisor in time and make modifications. (see attachment 2 training record of quality inspector)<br>3. The CP line has been inspected and incorporated into the system management according to the raw material control plan since April 8, 2020. (see Annex 3 incoming inspection report of CP line)<br>4. Check whether other raw material inspection items of the quality assurance system are similar and cause system missing.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: