1. Immediately increase the solderability inspection items in the quality assurance system, and increase the CP line solderability inspection items to the sixth solderability test in the quality assurance inspection system. (See appendix 1 for new screenshots of the inspection items of the quality assurance system) <br>2. Train new / in-service quality inspectors. If any inspection items in the system are found to be inconsistent with the "Raw Material Control Plan" during the inspection process, the IQC Section Chief shall be reported in time / Supervisor and make changes. (See Attachment 2 Training Record of Quality Inspector) <br>3. On April 8, 2020, the CP line was inspected according to the "Raw Material Control Plan" and included in the system management. (See Attachment 3 CP Line Incoming Inspection Report) <br>4. Check the quality assurance system for other raw material inspection items for similar conditions causing the system to be missing.
正在翻译中..