Including its Oymapınar hydropower plant, power capacity at Eti Alüminyum is set to top 700 MW in totalThe aluminum complex is located in Seydişehir, near the Mediterranean Sea in Konya province. Arkan said the firm wants to produce “clean and green aluminum” and ultimately reduce its net greenhouse gas emissions to zero. He added the facility’s annual output is 80,000 tons.