This project uses under-digging force pool, in order to facilitate the construction, the bottom plate of the force-reducing pool is made of such thickness, in order to reduce the penetration pressure at the bottom of the guard, can be under the guard straight drainage hole, and in the bottom of the guard tan laid antifiltration layer, drainage hole in the second half of the horizontal bottom plate, drainage hole diameter of 10cm, spacing of 2.0m, plum-shaped arrangement. The antifiltration layer is 30cm thick and divided into three layers, from top to bottom is 10cm gravel, 10cm medium sand, 10cm coarse sand.<br>The first end width of the force pool is 92.5m, and the diffusion angle of the force pool is set to 10 degrees, and the end width of the force pool is 100.7m.<br>The force-pool construction dimensions are shown in Figure 5-2.