本次工程采用下挖式消力池,为了便于施工,消力池底板做成等厚,为了降低护坦底部的渗透压力,可在护坦下设铅直排水孔,并在护坦底部铺设反滤层,排水的英语翻译

本次工程采用下挖式消力池,为了便于施工,消力池底板做成等厚,为了降低护

本次工程采用下挖式消力池,为了便于施工,消力池底板做成等厚,为了降低护坦底部的渗透压力,可在护坦下设铅直排水孔,并在护坦底部铺设反滤层,排水孔设在水平底板的后半部,排水孔直径为10cm,间距为2.0m,呈梅花形布置。反滤层厚为30cm,分三层,从上到下依次为10cm碎石,10cm中砂,10cm粗砂。消力池首端宽度为92.5m,消力池扩散角设置为10°,则消力池末端宽度为100.7m。消力池构造尺寸见图5-2。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
In this project, the digging type stilling pool is used. For ease of construction, the bottom of the stilling tank is made of equal thickness. In order to reduce the penetration pressure at the bottom of the protection tank, vertical drainage holes can be set under the protection tank and laid at the bottom In the anti-filter layer, the drainage holes are located in the rear half of the horizontal bottom plate. The drainage holes have a diameter of 10cm and a spacing of 2.0m. The filter layer is 30cm thick and divided into three layers. From top to bottom, it is 10cm gravel, 10cm medium sand, and 10cm coarse sand. <br>The width of the first end of the stilling tank is 92.5m, and the diffusion angle of the stilling tank is set to 10 °. <br>See Figure 5-2 for the structural dimensions of the stilling tank.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
This project uses under-digging force pool, in order to facilitate the construction, the bottom plate of the force-reducing pool is made of such thickness, in order to reduce the penetration pressure at the bottom of the guard, can be under the guard straight drainage hole, and in the bottom of the guard tan laid antifiltration layer, drainage hole in the second half of the horizontal bottom plate, drainage hole diameter of 10cm, spacing of 2.0m, plum-shaped arrangement. The antifiltration layer is 30cm thick and divided into three layers, from top to bottom is 10cm gravel, 10cm medium sand, 10cm coarse sand.<br>The first end width of the force pool is 92.5m, and the diffusion angle of the force pool is set to 10 degrees, and the end width of the force pool is 100.7m.<br>The force-pool construction dimensions are shown in Figure 5-2.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In this project, the undercut stilling basin is adopted. In order to facilitate the construction, the stilling basin bottom plate is made of equal thickness. In order to reduce the seepage pressure at the bottom of the apron, a vertical drainage hole can be set under the apron, and a reverse filter layer can be laid at the bottom of the apron. The drainage hole is set at the back half of the horizontal floor plate, with a diameter of 10cm and a spacing of 2.0m, arranged in a quincunx shape. The thickness of the inverted filter is 30cm, divided into three layers, from top to bottom are 10cm gravel, 10cm medium sand and 10cm coarse sand.<br>The width of the head end of the stilling basin is 92.5m, the diffusion angle of the stilling basin is set to 10 °, and the width of the end of the stilling basin is 100.7m.<br>See Figure 5-2 for the structural dimension of stilling basin.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.