8 GENERAL DESIGN REQUIREMENTSCONTRACTOR shall propose equipment and systems that meet Technical Requirements and Specifications specified in this document, in particular with the local and international regulations pertaining to equipment use and facility safety needs. Where proposed equipment deviates from requirements and specifications, CONTRACTOR shall list them in the Deviation List and CONTRACTOR may propose alternative equipment or system where such indications are made in the various sections of this document. Where no indications are made, CONTRACTOR shall comply fully to the requirements specified.