In addition to eliminating the two factors that affect the application of construction materials and transmission line construction technology, how the construction personnel construct, that is, the technical operation level of the construction personnel, is the core factor to ensure the final construction quality. Generally speaking, the construction process of transmission line is complex, and the wiring is also complex. Construction personnel must work together to ensure the accuracy of construction. At present, the technical level of most construction workers is relatively low. Due to the lack of sufficient professional construction technology, human errors often occur in the construction site, causing obstacles and some problems to the transmission line, reducing the construction efficiency and greatly reducing the construction efficiency. The final structure of the project cannot be guaranteed to be intact, which will have an adverse impact on the project quality. At the same time, the improper configuration of transmission line system is one of the reasons for the frequent occurrence of building quality problems.<br>
正在翻译中..