VICT AO would like to loan no more than 20% of the EPC contract fee of the project tothe project owner, and hold a specified volume (to be negotiated in the b付hcomingdraft contract) of shares of the project.2. The currency of capital financing is the US dollar.3. The p「•oject owner shall return all the principal and the interest (to be negotiated in thefo 「thc。ming dra仕contract) to VICTAO within the first 1-2 years(s) of the projectconstruction period gradually.4. The repayment of both principal and interest begins from no later than the 61h monthsince construction starting and then payable qua 时erly .5. Once the repayment, i.e. the terms 3 above, is done, VICTAO shall make all the sharestransferred back to the project owner.