1. Base coat treatment: clean up loose debris on the top surface of th的简体中文翻译

1. Base coat treatment: clean up lo

1. Base coat treatment: clean up loose debris on the top surface of the structural layer and the insulation layer. Debris and other debris protruding from the surface of the base layer should be shoveled and the effective thickness of the leveling layer should not be affected. 2. Plugging the roots of the pipes: Before large-scale smoothing, the roots of the pipes, etc. must be treated well.3. Cement mortar leveling layer: water must be sprayed to wet the surface of the base layer before construction, but excessive watering should not be used; according to the requirements of the slope, draw the line to find the slope, generally according to the elevation of 1 ~ 2 m. When spreading the leveling mortar, first press on the direction of the reinforcement flow and define the dividing joint of the leveling layer, the width is generally 20 mm and the joint is connected to the insulation layer , the maximum spacing of the dividing joint is 6 m. 4. Maintenance: the leveling layer is smoothed and compacted for 24 hours after watering. The general hardening period is 7 days. After drying, the waterproof layer is laid.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
1.底漆处理:清理结构层和隔热层顶面上的松散碎屑。从基层表面突出的碎屑和其他碎屑应铲除,并且流平层的有效厚度不应受到影响。<br>2.堵塞管子的根部:大规模修整之前,必须妥善处理管子的根部等。<br>3.水泥砂浆找平层:施工前必须喷水以润湿基层表面,但切勿过度浇水;根据坡度要求,画线找到坡度,一般按高程1〜2m。铺平找平砂浆时,首先沿增强流的方向施压,确定找平层的分隔缝,宽度通常为20 mm,且该缝与绝缘层相连,分隔缝的最大间距为6米 <br>4.维护:浇水后24小时将流平层抹平并压实。一般加固期为7天。干燥后,铺设防水层。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
1. Base coat treatment: clean up loose debris on the top surface of the structural layer and the insulation layer. Debris and other debris protruding from the surface of the base layer should be shoveled and the effective thickness of the leveling layer should not be affected. <br>2. Plugging the roots of the pipes: Before large-scale smoothing, the roots of the pipes, etc. must be treated well.<br>3. Cement mortar leveling layer: water must be sprayed to wet the surface of the base layer before construction, but excessive watering should not be used; according to the requirements of the slope, draw the line to find the slope, generally according to the elevation of 1 ~ 2 m. When spreading the leveling mortar, first press on the direction of the reinforcement flow and define the dividing joint of the leveling layer, the width is generally 20 mm and the joint is connected to the insulation layer , the maximum spacing of the dividing joint is 6 m. <br>4. Maintenance: the leveling layer is smoothed and compacted for 24 hours after watering. The general hardening period is 7 days. After drying, the waterproof layer is laid.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
一。基层处理:清理结构层顶面及保温层的松散杂物。从基层表面伸出的杂物和其他杂物应铲除,不得影响找平层的有效厚度。<br>2。堵根:在进行大面积整平之前,必须对管道根部等进行良好的处理。<br>三。水泥砂浆找平层:施工前必须洒水湿润基层表面,但不得过度洒水;根据坡度要求,画线找坡,一般按标高1~2m摊铺找平砂浆时,先按钢筋流向确定找平层分格缝,宽度一般为20 m m,分格缝与保温层连接,分格缝最大间距为6 m。<br>四。养护:找平层浇水后24小时平整压实。一般硬化期为7天。干燥后铺设防水层。
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.