1. Base coat treatment: clean up loose debris on the top surface of the structural layer and the insulation layer. Debris and other debris protruding from the surface of the base layer should be shoveled and the effective thickness of the leveling layer should not be affected. 2. Plugging the roots of the pipes: Before large-scale smoothing, the roots of the pipes, etc. must be treated well.3. Cement mortar leveling layer: water must be sprayed to wet the surface of the base layer before construction, but excessive watering should not be used; according to the requirements of the slope, draw the line to find the slope, generally according to the elevation of 1 ~ 2 m. When spreading the leveling mortar, first press on the direction of the reinforcement flow and define the dividing joint of the leveling layer, the width is generally 20 mm and the joint is connected to the insulation layer , the maximum spacing of the dividing joint is 6 m. 4. Maintenance: the leveling layer is smoothed and compacted for 24 hours after watering. The general hardening period is 7 days. After drying, the waterproof layer is laid.
1. Base coat treatment: clean up loose debris on the top surface of the structural layer and the insulation layer. Debris and other debris protruding from the surface of the base layer should be shoveled and the effective thickness of the leveling layer should not be affected. <br>2. Plugging the roots of the pipes: Before large-scale smoothing, the roots of the pipes, etc. must be treated well.<br>3. Cement mortar leveling layer: water must be sprayed to wet the surface of the base layer before construction, but excessive watering should not be used; according to the requirements of the slope, draw the line to find the slope, generally according to the elevation of 1 ~ 2 m. When spreading the leveling mortar, first press on the direction of the reinforcement flow and define the dividing joint of the leveling layer, the width is generally 20 mm and the joint is connected to the insulation layer , the maximum spacing of the dividing joint is 6 m. <br>4. Maintenance: the leveling layer is smoothed and compacted for 24 hours after watering. The general hardening period is 7 days. After drying, the waterproof layer is laid.
正在翻译中..