• The harness shall be routed in a straight line. The length of this harness and the arrangement of the test harness shall follow the instructions in the different standards referred in each test, e.g., CISPR 25, ISO 11452 series, ISO 10605 and ISO 7637-1 etc, unless stated elsewise in this specification.• The harness shall contain wiring types (e.g. twisted wire pairs) that are used in the actual vehicle installation. The use of shielded cables is not allowed unless specifically called out in the drawings and documented in the EMC test plan and report. Selected tests may require shorter power/power return wiring between the DUT and measurement system.• Actual test setup shall be documented in the test plan and report.