1. Staff operation leakage, self inspection is not in place, resulting in rain leakage. .<br>2. The defect was not detected by each other in the later process (back cover decoration post) before the cover was dropped, resulting in the outflow of defects.<br>1. No such defects were found in the front and back of 50 vehicles.<br>2. Talk with the operator of the left flow channel post, conduct performance deduction treatment, retrain the standardized operation, and solidify the operation steps and methods. The operators of rear cover decoration post shall be retrained in the qrk mutual inspection scheme of PVC section, and the mutual inspection scheme shall be strictly followed.<br>3. In view of this defect, the person in charge of the team inspected 10 vehicles every day for a week.<br>
正在翻译中..