5.Z2Dimensional inspectionDimensions shall be checked dimensions and tolerances called up inpurchase order drawing.This test must always be carried out on finished parts.Visible liquid penetrating test shall be carried out as per ASTM E 165.All surface defects shall be removed and investigated as to their nature andextent. The resulting information shall be reported to ABB for final judgmenton ring acceptability.Accepted material subsequently found to have defects not identified by thesupplier or by embedded inspectors at supplier's, or which after inspectionand testing is found not to meet the requirements of this specification, maybe rejected and returned entirely or in part to the supplier.5.2.3Liquid penetrating inspection5.3Acceptance