When pouring concrete at beams and column joints of different strength levels. High-strength grade beams and column joints should be poured first, and after stopping 1.5h initial condensation, then pouring low-grade beams and plates. The concrete of the girder should be poured at the same time, the main secondary beam should be poured in the direction of the secondary beam, and the one-way slab should start pouring along the long side direction of the plate.