1, this problem will be immediately feedback to the production line, require the production line in the dry burning post for large dry burning, functional post needs to check the heating wire patch when the power is still there, bad products picked out to do dry burning after pull-down, until the product does not have this undesirable phenomenon, after the functional test qualified pull-down.
正在翻译中..