Fixed axes should be ejected from the rectangular column of the outdoor corner of the building, red paint should be used as the standard, and the meridian should be used to guide the line by layer, after each layer is placed, the axis must be checked for closure, and the construction of the next process can be carried out after the closure. In addition to meeting the design strength requirements, the mortar used in the block should also have better ease and water retention.
正在翻译中..