Materials are strictly prohibited for pre-inspection, in the plastic drainboard insertion process to stand side, to ensure that the insertion depth and spacing in line with the requirements.<br>In the vacuum pre-pressurized foundation treatment surrounding exploration, to find out the geological conditions of the sealing ditch site, the site containing sand sandwich to carry out the construction of the water curtain, the formation of a sealing wall.<br>The construction of the foundation strengthens the monitoring of the settlement rate, vacuum degree, pore water pressure, etc.
正在翻译中..