终检针对检查员记录问题留相关故障车进行分析针对外闪问题在南广场留3台故障车拉动外检科进行分析针对车门玻璃升降异响问题需终检留故障车进行分析针的英语翻译

终检针对检查员记录问题留相关故障车进行分析针对外闪问题在南广场留3台故

终检针对检查员记录问题留相关故障车进行分析针对外闪问题在南广场留3台故障车拉动外检科进行分析针对车门玻璃升降异响问题需终检留故障车进行分析针对小灯接头插接容易错位问题,拉动设计人员对插接件进行评审。问题措施采取一周后千台无向好趋势,需重新分析并制定措施。组织供应商提供改进后的零部件进行小批量试装针对不同供应商零部件进行颠簸路试验落实来件状态是否与技术封样状态一致根据设计要求需总装进行为期一周时间使用定扭电动工具装配转向护壳,作为力矩影响的验证。对仪表台划伤部位进行梳理,分析划伤原因针对示廓灯等电器插接件问题组织采购部、技术中心、质量人员进行评审。组织技术中心、质量人员对奔驰车型机油尺插入时需双手辅助操作的状态进行评估。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
In the final inspection, the inspector records the problem and the relevant faulty car is analyzed. For <br>the external flash problem, 3 faulty cars are reserved in the South Square to pull the external inspection department for analysis. The <br>door glass lift abnormal noise problem requires the final inspection to retain the faulty car for analysis. For <br>the small light connector Insertion is prone to misalignment problems, so designers are encouraged to review the connectors. <br>One week after the measures for the problem were taken, there was no positive trend for thousands of units, and it was necessary to reanalyze and formulate measures. <br>Organize suppliers to provide improved parts for small batch trial assembly <br>. Carry out bumpy road tests for different supplier parts. <br>Confirm whether the status of the incoming parts is consistent with the state of the technical seal. <br>According to the design requirements, the final assembly is required for a week of assembly using fixed torque power tools Turn to the protective shell as a verification of the torque effect. <br>Sort out the scratched parts of the instrument panel, analyze the cause of the scratches <br>, organize the purchasing department, technical center, and quality personnel to review the problems of electrical plug-in parts such as outline lights. <br>Organize technical center and quality personnel to evaluate the state of assisting operation with both hands when inserting the oil dipstick of Mercedes-Benz models.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Final inspection for the inspector to record the problem left related to the fault of the vehicle analysis.<br>For the problem of flashing in the South Square left 3 faulty cars pull external inspection section for analysis.<br>The problem of door glass lifting and noise needs to be analyzed by the terminal inspection and retention of the faulty vehicle.<br>In view of the easy misalignment of small light connector slots, pull the designer to review the connector.<br>The problem measures take a week after the thousand sending no good trend, need to be re-analysed and developed measures.<br>Organize suppliers to provide improved components for small batch commissioning.<br>Bump tests for different supplier components.<br>Whether the implementation of the incoming status is consistent with the technical seal ingress status.<br>According to the design requirements, the assembly needs to be installed for a period of one week using fixed-twisting power tools to assemble the steering shell as a verification of torque effects.<br>Comb the scratch site of the instrument table and analyze the cause of the scratch.<br>For the profile lamp and other electrical plug-in problems to organize procurement department, technology center, quality personnel to review.<br>Organization technology center, quality personnel to the Mercedes-Benz model oil ruler insertion needs to be two-hand auxiliary operation status assessment.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In the final inspection, the problem of inspector's record shall be reserved for analysis<br>Aiming at the problem of external flash, three faulty vehicles were left in the South Square to pull the external inspection department for analysis<br>In view of the abnormal noise caused by the door glass lifting, it is necessary to retain the fault vehicle for analysis<br>Aiming at the problem that the small lamp connector is easy to be misplaced, the designer is pulled to review the connector.<br>After a week of measures taken, 1000 units have no good trend, so it is necessary to re analyze and formulate measures.<br>Organize suppliers to provide improved parts for small batch trial assembly<br>Bumpy road test for parts from different suppliers<br>Whether the status of incoming parts is consistent with that of technical sealing sample<br>According to the design requirements, the final assembly is required for one week, and the fixed torque electric tool is used to assemble the steering case as the verification of torque influence.<br>The scratch parts of the instrument panel were sorted out, and the causes of the scratch were analyzed<br>Organize the purchasing department, technical center and quality personnel to review the problems of electrical connectors such as outline lights.<br>Organize technical center and quality personnel to evaluate the condition of manual operation when inserting oil dipstick of Benz model.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: