You can not repair the problem concession 18, of which two have switched new state, in which the item 18 more in the old state GTL models, making the transition to use; the rest yet to come handover date, waiting for verification.
Non-repair problem concession received 18 items, of which 2 have switched to the new state, of which the 18th gtL model old state more, is in transition use;
18 items of non repairable problems have been accepted in concession, of which 2 items have been switched to new status, among which GTL models in Item 18 have more old status and are in transitional use; the rest have not reached the switching date and are waiting for verification.<br>