In view of the geological background and mining technical conditions of the special thick coal seam mining project of Long Wanggou Coal Mine, the top plate structure under the conditions of the special thick coal seam mining and high comprehensive mining was analyzed, and the optimal design of the top plate of the 61601 work surface of Long Wanggou mine was optimized, and the mining ratio was determined to be 1:2.74 and the coal release step distance was 0.865m. According to the conditions of high-lift mining of the special thick coal seam of Long Wanggou mine, the reasonable supporting parameters of the three machines of this work surface are calculated and determined, the line design of the hydraulic support is optimized to ensure the safe passing of pedestrians behind the pillar of the support, the parameters of the scraper conveyor are determined, and the relationship between the volume and laying length of the different work surface tilt is analyzed, and the width of the inner groove is determined by calculating the cross-section of the scraper conveyor.
正在翻译中..