Concrete poured on beam is pumped, the cementing material consumption is large and generated hydration heat is large, therefore, for avoiding cracks caused by air shrinkage and temperature difference, after pouring of concrete is finished, geotextile shall be used to cover concrete for curing within 12 h, and plastic membrane shall be covered on the geotextile.