在屋面工程施工前,凡进入隐蔽工程的施工项目,应对前分项分部工程进行验收。防水施工前,基层应干燥、平整、光滑,阴阳角要做成小圆脚。屋面工程施工的英语翻译

在屋面工程施工前,凡进入隐蔽工程的施工项目,应对前分项分部工程进行验收

在屋面工程施工前,凡进入隐蔽工程的施工项目,应对前分项分部工程进行验收。防水施工前,基层应干燥、平整、光滑,阴阳角要做成小圆脚。屋面工程施工时,注意掌握温度,保证防水功能,无渗漏现象,其构造和防水保温层必须符合设计要求。屋面工程施工完成后,应采取妥善保护措施防止损坏。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Before the construction of the roofing project, any construction project that enters the concealed project should be checked and accepted by the previous sub-project. Before waterproof construction, the base layer should be dry, flat and smooth, and the yin and yang corners should be made into small round feet. During the construction of the roofing project, pay attention to the temperature to ensure the waterproof function and no leakage. The structure and the waterproof insulation layer must meet the design requirements. After the roofing project is completed, proper protection measures should be taken to prevent damage.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Before the roofing project construction, where the construction project enters the hidden project, the former sub-division project shall be accepted. Before waterproof construction, the grass should be dry, flat, smooth, yin and yang angle to be made into small round feet. Roofing project construction, pay attention to grasp the temperature, to ensure waterproof function, no leakage phenomenon, its construction and waterproof insulation layer must meet the design requirements. After the construction of roofing works is completed, proper protective measures should be taken to prevent damage.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Before the construction of roof works, all the construction projects entering the concealed works shall be checked and accepted by the previous sub projects. Before waterproof construction, the base should be dry, flat and smooth, and the internal and external corners should be made into small round feet. During the construction of roof engineering, attention should be paid to the temperature to ensure the waterproof function without leakage. The structure and waterproof insulation layer must meet the design requirements. After the construction of roof works is completed, proper protection measures shall be taken to prevent damage.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: