The surface of the formwork should be cleaned up, and hard cement mortar and other debris should not be pasted. Before pouring the concrete, the formwork must be completely wetted. When the template is slotted, the paper and putty of the linoleum should be blocked by oil. The selection of die release agent should have a lasting effect, and the coating should be uniform and not lost. The concrete should be evenly layered and vibrated tightly to eliminate air bubbles. (2) The concrete mixing time should be appropriate, generally 1-2 minutes. (3) When the concrete construction height exceeds 2 meters, measures such as ropes, elephant trunks or vibrating elephant trunks must be taken for delicious entertainment. (4) After the concrete is put into the mold, the vibration time must be mastered. Generally speaking, the vibration time of each point is about 20-30. Secondly, a reasonable vibration time can be judged by the following phenomena: the concrete no longer sinks significantly, there are no bubbles, the thick liquid on the concrete surface is also in a horizontal position, and the material at the corners of the concrete mold is enriched.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
应当清洁模板的表面,并且不应粘贴硬水泥砂浆和其他碎屑。在浇筑混凝土之前,必须将模板完全润湿。放开模板时,油毡应将油毡的纸和油灰堵塞。脱模剂的选择应具有持久的作用,并且涂层应均匀而不失色。混凝土应均匀地分层并紧密振动以消除气泡。(2)混凝土的搅拌时间应适当,一般为1-2分钟。(3)当混凝土建筑高度超过2米时,必须采取绳索,象鼻或振动象鼻等措施,以娱乐娱乐。(4)将混凝土放入模具后,必须掌握振动时间。一般来说,每个点的振动时间约为20-30。其次,可以通过以下现象判断振动的合理时间:混凝土不再明显下沉,没有气泡,混凝土表面上的浓稠液体也处于水平位置,并且材料在混凝土模具的拐角处丰富了。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
应清理模板的表面,不应粘贴硬水泥砂浆和其他碎屑。在浇注混凝土之前,模板必须完全湿润。模板槽槽时,油毡的纸张和推杆应被油堵住。模释放剂的选择应具有持久效果,涂层应均匀且不丢失。混凝土应均匀分层和振动,以消除气泡。(2)混凝土搅拌时间应适当,一般为1-2分钟。(3) 混凝土施工高度超过2米时,必须采取绳索、大象躯干、振动大象树干等措施进行美味娱乐。(4) 混凝土放入模具后,必须掌握振动时间。一般来说,每个点的振动时间大约为20-30。其次,一个合理的振动时间可以通过以下现象来判断:混凝土不再明显下沉,没有气泡,混凝土表面的厚液体也处于水平位置,混凝土模具角的材料也更加丰富。
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
The surface of the formwork should be cleaned up, and hard cement mortar and other debris should not be pasted. Before pouring the concrete, the formwork must be completely wetted. When the template is slotted, the paper and putty of the linoleum should be blocked by oil. The selection of die release agent should have a lasting effect, and the coating should be uniform and not lost. The concrete should be evenly layered and vibrated tightly to eliminate air bubbles. (2) The concrete mixing time should be appropriate, generally 1-2 minutes. (3) When the concrete construction height exceeds 2 meters, measures such as ropes, elephant trunks or vibrating elephant trunks must be taken for delicious entertainment. (4) After the concrete is put into the mold, the vibration time must be mastered. Generally speaking, the vibration time of each point is about 20-30. Secondly, a reasonable vibration time can be judged by the following phenomena: the concrete no longer sinks significantly, there are no bubbles, the thick liquid on the concrete surface is also in a horizontal position, and the material at the corners of the concrete mold is enriched.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.