Layer AGV reaches the automatic door (the outside of an automatic door, the automatic door which is 2) at the opening and closing operation needs to be performed, when the AGV from the outside into the process once for <br>(A). AGV request reaches the open position, issuing a request to open the door 1 ; <br>. (B) after completion of the information system receives a request to open the door back to the AGV open feedback; <br>(C) AGV feedback system determines the door 1 is open (open system feedback information fails, for example, open order error);. <br>(D) .AGV 1, and proceeds to the automatic door closing automatically after the second transition space, and out of the automatic door closing range of 1, 1 closed issue request; <br>(E) information system receives the request back to the AGV 1 is completed closing door closing is complete;. <br>(G). AGV 2 received door open request is issued after a complete closing; <br>(H) after the completion of the information system receives a request to open the door to open the door back to the AGV feedback;. <br>(the I) .AGV feedback system determines the door 2 is opened (open system feedback information fails , for example, open order error); <br>(J) to enter the explosion .AGV space, and leaves the range of the automatic closing of the door 2, 2 closed issue request; <br>(K) information system 2 receives the request back to the AGV complete closing door closing is complete. ; <br>(L) .AGV proceeds to the inverted loading station ;
正在翻译中..