Cutting of blocks pavings. 3. Granular Material 3.01 Aggregate base and sub base courses agiven in cubic meters measured as equal to the void filled after compaction to the depths shown in the drawings. 3.02 Work is deemed to include: - Preparing surfaces to receive the aggregate layer. - Filling & compacting in layers including leveling & grading to the required levels. - Removing from site surplus aggregate materials after completion. 4. Precast Concrete and granite Curbs 4.01 Curb edges are given separately, stating the dimensions or type. 4.02 Curb edges are given in linear meters. 4.03 Work is deemed to include: a. Excavation in any material whatsoever encountered. b. Backfilling and disposal of surplus excavated material. c. Concrete foundations and haunching including reinforcement and formwork. d. Bedding and jointing. e. Ends, angles and intersections including special units. f. Cutting. g. Curved work to any radius.