When issuing materials employees must pay attention to the same capacity, the same size, different voltages, the same specifications, different series, the same specifications, different materials (needle, rubber cover, aluminum shell, hose material and trademark different), different special requirements may not be sent to the same machine before and after batch production, to prevent mixing. In special cases, it is necessary to report the manufacturing class leader and the process PQC foreman in the form of a written report, and to check the machine platform together with the head of the manufacturing course and the personnel above the pQC foreman level to ensure that there is no previous batch of materials and products left behind before the naked goods can be issued.
正在翻译中..