whereN is the number of time periods in the test window.Xt is the portfolio outcome, that is, the portfolio return or portfolio profit and loss for period t.pVaR is the probability of VaR failure defined as 1-VaR level.ESt is the estimated expected shortfall for period t.It is the VaR failure indicator on period t with a value of 1 if Xt