此次设计是对镇平县滴水崖桥升级改造,桥位于二龙乡白湾村南,对其进行工程升级改造,将原技术标准由三级公路提升为二级公路,设计速度为80公里每小时。桥面宽度(1.5m人行道+11.4m行车道+1.5m),桥梁设计全长8m,桥梁计算跨径为4m。主梁截面为预制T型梁,采用钢筋混凝土结构。设计时首先跟据地形地貌拟定方案,然后进行方案比选确定设计方案。再依次进行桥梁的平面设计,桥梁的纵断面设计,桥梁上部结构设计,支座设计。最后进行施工图绘制。
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
此次设计是对镇平县滴水崖桥升级改造,桥位于二龙乡白湾村南,对其进行工程升级改造,将原技术标准由三级公路提升为二级公路,设计速度为80公里每小时。桥面宽度(1.5m人行道+11.4m行车道+1.5m),桥梁设计全长8m,桥梁计算跨径为4m。主梁截面为预制T型梁,采用钢筋混凝土结构。设计时首先跟据地形地貌拟定方案,然后进行方案比选确定设计方案。再依次进行桥梁的平面设计,桥梁的纵断面设计,桥梁上部结构设计,支座设计。最后进行施工图绘制。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
This design is to upgrade and reconstruct the Dishuiya Bridge in Zhenping County, which is located in the south of Baiwan Village, Erlong Township. The project will upgrade and reconstruct it, and upgrade the original technical standard from third-class highway to second-class highway, with a design speed of 80 kilometers per hour. The width of the bridge deck (1.5m sidewalk+11.4m carriageway+1.5m), the designed total length of the bridge is 8m, and the calculated span of the bridge is 4m. The main beam section is prefabricated T-beam, which is of reinforced concrete structure. When designing, the first step is to develop a plan based on the terrain and topography, and then compare and select the design plan to determine it. Then proceed with the plane design of the bridge, the vertical section design of the bridge, the upper structure design of the bridge, and the support design in sequence. Finally, draw the construction drawings.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
This design is an upgrade of zhenping county dishuiya Bridge, which is located in the south of Baiwan Village, Erlong Township. The original technical standard is upgraded from a third-class highway to a second-class highway with a design speed of 80 kilometers per hour. The bridge deck width (1.5m sidewalk +11.4m carriageway +1.5m), the designed total length of the bridge is 8m, and the calculated span of the bridge is 4m. The cross section of the main girder is a precast T-beam, which adopts reinforced concrete structure. When designing, firstly, draw up the scheme according to the topography, and then compare and select the schemes to determine the design scheme. Then the plane design of the bridge, the longitudinal section design of the bridge, the superstructure design of the bridge and the bearing design are carried out in turn. Finally, draw the construction drawing.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: