Pump House project construction site, due to the dismantling of the waste oil recovery system equipment, the equipment has three cables for power supply from the waste oil recovery system to the CCB WWPT distribution room (see attachment) ; now need to be dismantled; please help to coordinate the isolation of the power supply points in the schedule, thank you.