In the future, when all factories need to ask MCC to evaluate power cord samples, they will need to provide the power cords that have been mass-produced by the local factories to MCC.
In the future, when all plants need to have MCC evaluate power cord samples, they will need to provide the local plant already in volume the power cord to MCC.
In the future, when all factories need to let MCC evaluate the power line samples, they need to provide the power lines that have been mass produced by local factories to MCC<br>