为确保正确的安装冷风套和窑口护板,先确定回转窑筒体外壁和冷风套内壁的安装位置。然后根据回转窑的转动方向将支撑座焊接在冷风套的内壁上,大约2米的英语翻译

为确保正确的安装冷风套和窑口护板,先确定回转窑筒体外壁和冷风套内壁的安

为确保正确的安装冷风套和窑口护板,先确定回转窑筒体外壁和冷风套内壁的安装位置。然后根据回转窑的转动方向将支撑座焊接在冷风套的内壁上,大约2米左右焊接一个,为了让冷风套主要承受拉力,将弹簧板均匀地焊在回转窑的外壁上,焊条采用J506。注意:焊接的时候焊缝的要求为平滑,不能够有气孔夹渣等缺陷,如若发现必须及时修补;焊缝表面不应存在裂纹、气孔、熔渣和未焊透等一系列的缺陷,保证焊接质量。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
In order to ensure the correct installation of the cold air jacket and the kiln mouth guard, first determine the installation location of the outer wall of the rotary kiln shell and the inner wall of the cold air jacket. Then, according to the rotation direction of the rotary kiln, the support base is welded to the inner wall of the cold air jacket, about one meter is welded. In order to make the cold air jacket mainly bear the tensile force, the spring plate is welded to the outer wall of the rotary kiln evenly. The welding rod is J506. Note: When welding, the requirements of the welding seam are smooth, and there should be no defects such as pores and slag inclusions. If it is found that it must be repaired in time; the surface of the welding seam should not have a series of defects such as cracks, pores, slag and under-welding. Welding quality.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
To ensure the correct installation of cold air cover and kiln guard, first determine the outer wall of the rotary kiln barrel and the inner wall of the cold air sleeve installation position. Then according to the rotation direction of the rotary kiln will be welded support seat on the inner wall of the cold air sleeve, about 2 meters or so welded one, in order to allow the cold air sleeve to bear the main pull force, the spring plate is evenly welded on the outside wall of the rotary kiln, the welding rod using J506. Note: Welding weld requirements for smooth, can not have pores such as slag defects, such as if found must be repaired in a timely manner, weld surface should not have cracks, pores, slag and unwelded through a series of defects, to ensure the quality of welding.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In order to ensure the correct installation of the cold air sleeve and the kiln mouth guard board, first determine the installation position of the outer wall of the rotary kiln shell and the inner wall of the cold air sleeve. Then according to the rotation direction of the rotary kiln, the support seat is welded on the inner wall of the cold air sleeve, about 2 meters. In order to make the cold air sleeve bear the main tension, the spring plate is welded on the outer wall of the rotary kiln evenly, and the welding rod is j506. Note: during welding, the weld shall be smooth and free of defects such as porosity and slag inclusion. If found, it shall be repaired in time. The weld surface shall be free of cracks, porosity, slag, incomplete penetration and other defects to ensure the welding quality.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: