Personnel arrangement: This gold panning ship requires 3-4 people to operate each shift. One person is responsible for operating the distribution cabinet and controlling the entire gold panning ship to mine from the river (this operator needs to understand the operation and maintenance of the electrical control cabinet, and has certain Relevant experience in operating a sand dredger or gold panning ship). One person is responsible for mechanical maintenance, specializing in the observation and maintenance of various parts of the equipment (this operator needs to have rich experience in mechanical debugging and maintenance, and observe the operation of the equipment at any time, for example, whether the bearing has abnormal noise, whether the bolt is loose or falling off, and the triangle Whether the belt is tightened, whether the bearing is lack of oil, whether the cable is damaged or broken, etc., if any abnormality is found, deal with it immediately. Do a comprehensive inspection before starting the machine every day, and start production after the equipment is normal.) The other one or two people cooperate with other related tasks, such as checking whether the generator set is short of water or oil, whether the reducer and water supply pump are short of oil, cleaning the chute, etc. <br>Working conditions of the gold panning ship: the temperature in summer is not higher than 50 degrees Celsius, and the temperature in winter is not lower than -10 degrees Celsius.
正在翻译中..