1, the procurement department in the development of B point suppliers should first check whether the drawing version is up-to-date, and confirm whether the drawingist is marked with the key dimensions of parts, according to the size of the drawing can be qualified testing for parts;<br>2, the need to purchase the Department to improve the supplier factory self-inspection standards;<br>3, for the color requirements of the parts and components to be purchased in the receipt of drawings and swatches should check the drawing requirements and swatches are consistent;<br>4, for the drawings marked with tolerance range procurement department in the receipt of technical drawings should verify that the drawing dimensions are reasonable, and organize suppliers to match each other's components for the limit matching experiment.
正在翻译中..